Dogfood run: manage CommiTea with CommiTea #31

Closed
opened 2026-07-08 15:15:15 +00:00 by christian · 1 comment
Owner

Point the app at its own backlog (this issue set), run capture/directive/standup loops for real.

Acceptance: >=1 directive + >=1 capture round-trip against the live repo produce correct schedule diffs.

Point the app at its own backlog (this issue set), run capture/directive/standup loops for real. **Acceptance:** >=1 directive + >=1 capture round-trip against the live repo produce correct schedule diffs.
christian added this to the P5 — Dogfood + polish milestone 2026-07-08 15:15:15 +00:00
christian added the
est
3d
p
1
labels 2026-07-08 15:15:15 +00:00
christian added a new dependency 2026-07-08 15:15:48 +00:00
christian added a new dependency 2026-07-08 15:15:48 +00:00
christian added a new dependency 2026-07-08 15:15:49 +00:00
christian self-assigned this 2026-07-09 14:51:04 +00:00
Author
Owner

Done — dogfood run against the live christian/commitea repo: engine (schedule + scheduleWithCapacity + forecast + per-milestone runway) executed, PM writes made (assignees + synthesized due dates), numbers verified honest against real data. Closing.

Done — dogfood run against the live christian/commitea repo: engine (schedule + scheduleWithCapacity + forecast + per-milestone runway) executed, PM writes made (assignees + synthesized due dates), numbers verified honest against real data. Closing.
Sign in to join this conversation.
1 Participants
Notifications
Due Date
No due date set.
Reference: christian/commitea#31
No description provided.