Resolve the five design-session open items from PLAN.md: - decisions.md: soft write-path, poll-only sync (NAT), lognormal cold-start priors, purity test binds the SQLite cache - pm-state.md: sidecar layout + directive/capacity/calibration schemas + lifecycle inference table - agent-tools.md: query_project read tool + three write tools Also gitignore .env.* (protect the gitea PAT) and record the P0 actual: 10 labels, 5 milestones, 34 tracer-bullet issues + 51 dependencies filed on christian/commitea as the first managed project. Co-Authored-By: Claude Opus 4.8 (1M context) <noreply@anthropic.com>
5.9 KiB
pm-state: the sidecar store
Machine-derived and PM-authored state that has no home in the work repo. Split across two tiers per decisions.md D4:
pm-stategitea repo — durable, versioned truth. Committed files below.- local SQLite — rebuildable cache/index. Never the source of truth.
pm-state repo layout
charter.md durable project charter + hot-memory seed (human + agent authored)
directives/log.jsonl durable append-only directive ledger (conflict-free merge)
capacity/members.yaml durable per-person capacity model (human-set)
calibration/model.json cached fitted calibration; regenerable from actuals, committed for
reproducibility + offline forecasting
forecasts/, focus/, and inferred lifecycle timestamps are not committed
— they are SQLite-only and recomputed on rebuild (regenerable from the work repo
- calibration model).
Directive log — directives/log.jsonl
Append-only, one JSON object per line. Merge is concatenation: order is
derived from ts at read time, so two clients appending never produce a git
conflict. id is the durable key; seq is a display ordinal computed on read,
never stored (avoids the "who owns the next number" contention). v1 is
single-writer (one PM); this format is already safe for the deferred
multi-writer case.
{
"id": "d_01J8...", // crypto.randomUUID at write; durable identity
"ts": "2026-07-08T14:03:00Z", // ISO 8601 UTC; sole ordering key
"actor": "christian", // gitea username of the directive-giver
"kind": "reprioritize", // reprioritize | reestimate | set-deadline | scope | capacity | note
"target": { "issue": 87 }, // { issue } | { milestone } | { member } | null (project-wide)
"quote": "bump the auth bug above everything", // verbatim, shown in the ledger
"params": { "priority": 1 }, // structured effect the scheduler applies
"rationale": "pilot customer blocked", // why (optional but nagged for)
"status": "accepted" // proposed | accepted | amended | withdrawn
}
Lifecycle: a directive is recorded as proposed, the scheduler re-runs, the
agent presents the consequence diff, and the PM's response flips it to
accepted / amended / withdrawn. All four states stay in the ledger
(append a status-change line; never mutate a prior line).
Capacity — capacity/members.yaml
Estimate unit is ideal person-days. Capacity is expressed in ideal person-days available per calendar day.
members:
- gitea: christian
focusFactor: 0.8 # productive fraction of a working day (0..1)
projectAllocation: 0.6 # share of focused time on THIS project (0..1)
workdays: [mon, tue, wed, thu, fri]
daysOff: [] # ISO dates, e.g. ["2026-07-14"]; PTO calendars deferred
# other standing slices (compliance 0.2, pilots 0.2) are documentation only —
# only projectAllocation feeds the scheduler.
Derived: capacityPerWorkday = focusFactor * projectAllocation (ideal
person-days per working day). The scheduler spreads this across workdays,
zeroing daysOff. Missing member ⇒ excluded from capacity, flagged by the agent.
Calibration — calibration/model.json
Fitted from closed-issue actuals (estimate label vs inferred elapsed working
time). Lognormal on log(actual / estimate).
{
"version": 1,
"fittedAt": "2026-07-08T00:00:00Z",
"n": 42, // closed issues with an estimate feeding the fit
"coldStart": false, // true while n < 20 → scheduler uses code priors instead
"global": { "mu": 0.166, "sigma": 0.45 }, // lognormal params on log-ratio; median ratio = e^mu ≈ 1.18
"byBucket": { // per estimate label; falls back to global when its n is thin
"1d": { "mu": 0.30, "sigma": 0.55, "n": 12 },
"2d": { "mu": 0.18, "sigma": 0.40, "n": 9 }
// 3d / 5d / 8d ...
},
"byLabel": { "backend": { "biasMu": 0.12, "n": 7 } }, // additive to mu; applied when n ≥ floor
"byPerson": { "christian": { "biasMu": -0.05, "n": 20 } }
}
Cold-start (coldStart: true, or a bucket with n below floor): the scheduler
ignores the file's fitted params for that axis and samples the code-resident
lognormal priors in @commitea/core (per D3). The file still records whatever
partial n exists so the UI's calibration teaser can show progress toward 20.
SQLite cache (rebuildable — not committed)
Mirror + derived tables, rebuilt from both gitea repos on reconcile:
issues,labels,milestones,comments,issue_events— verbatim work-repo mirrorlifecycle— inferred per-issue timestamps (see below), keyed by issueforecasts— last Monte Carlo run per milestone/issue (regenerable)focus— current Now/Next/Later snapshot (regenerable)directives— indexed view oflog.jsonlfor fast querying
Lifecycle inference
Timestamps derived from the gitea issue timeline; no manual time tracking. Maps onto the board's five columns:
| Board column | Enter when | Source event |
|---|---|---|
| Diagnosis | issue opened | opened |
| Triage | first label or milestone applied | label / milestone |
| Steeping | first branch or commit references the issue | commit_ref / branch |
| In review | a PR referencing the issue is opened | PR opened |
| Done | issue closed (PR merged is the deploy signal within) | closed / PR merged |
Elapsed working time between Steeping→Done (minus non-workdays/daysOff) is the "actual" that feeds calibration. Re-openings append new segments; the fit uses summed working time.