Files
commitea/apps
Croissant Le Doux c120f34a4a Phase B: real data for the last fixture screens
Every remaining fixture-only surface now renders reconciled gitea data,
with the fixture kept only as the no-config demo fallback.

- lib/views/project-data.ts: ProjectData — the uniform input (reconciled
  backlog + deps + timelines + calibration + workers + today) that AppShell
  assembles once and every view builder consumes.
- lib/views/{issue-detail,gantt-view,deps-graph,standup-view,inbox-view}.ts:
  pure builders, ProjectData → the fixture-shaped object each screen already
  renders. Real signals only; honest degradation where a signal isn't derivable
  (buffered p80 vs per-issue Monte Carlo; flat "idle in review"; no fabricated
  inbox mentions/outages).
- Screens take an optional `data?` and fall back to the fixture; AppShell wires
  the real view whenever the backlog is reconciled. Issue "blocks" chips and the
  rail inbox badge now resolve from real data too.
- Dev-only rail surfaces (First run / States / Primitives) gated on
  import.meta.env.DEV || demo — shown in dev + e2e, hidden in a packaged app.
  Rail host label reflects the connected instance.
- Extended the live onboarding e2e to click Board → Gantt → Deps → Issue
  sidecar → Standup → Inbox on real gitea data with a pageerror guard; 14
  fixture e2e stay green, typecheck + prod build clean.

Co-Authored-By: Claude Opus 4.8 (1M context) <noreply@anthropic.com>
2026-07-09 02:38:52 -04:00
..